Hybrid

1.1 MW

Hydro Tasmania

$13.38mil

Under Construction

Flinders Island

TAS

Battery


Description:

Combining solar, wind, diesel, storage & enabling technologies to displace more than 60% of the island’s diesel generated energy. The 900 kW wind turbine and 200 kW solar array uses enabling technologies and an advanced control system to manage the fluctuating mix of wind, solar and diesel power in a stable, secure and reliable way. The enabling technologies on Flinders include a 750 kilowatt / 266 kilowatt-hour battery, an 850 kilovolt-ampere flywheel, and a 1.5 megawatt dynamic resistor.

Major Contractors/Suppliers:

-

Updates:

  • Dec, 2017 : Construction completed
  • : ARENA funding: $5.5mil

* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)


approximate representation only

Simon Gamble

Name : Simon Gamble

Title : Manager Hybrid Off-Grid Solutions

Phone : (03) 6230 5340

Email : [email protected]