Solar PV

400 MW

Solar Megawatt Holding

-

Proposed

Wollar

NSW

Battery


Description:

The proposal area is approximately 800 ha and of which around half will be developed on. 922,432 solar panels are planned to be installed on either mounted on fixed or tracking systems. There is provision for a 30MWh lithium-ion battery. There is an existing TransGrid substation ~900m east of the site as well as a 330 kV transmission line.

Major Contractors/Suppliers:

-

Updates:

  • 2018, Oct : Declared a controled action by the Department of the Environment & Energy
  • 2018, Aug : EIS on public display under EPBC Act
  • 2018, Apr : Development application submitted to NSW Government

* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)


approximate representation only

Bruce Howard

Name : Bruce Howard

Title : Managing Director

Phone : (02) 7200 7068

Email : bruce.howard@wollarsolarfarm.com



* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)