Wind

29 MW

Pacific Hydro

$130mil

Under Construction

Ballan

VIC

-


Description:

Commenced construction in late 2016 and expected to be complete in early 2018. 14 Senvion MM92 wind turbine generators, rated at 2.05MW each, providing total installed capacity of 28.7 MW. Located in the southern section of the Parwan Valley, predominantly cleared agricultural land used for cropping and livestock grazing.

Major Contractors/Suppliers:

BOP works: RCR Tomlinson & WBHO Infrastructure

Updates:

  • 2017, Jun : Application made for generation licence
  • 2017, Jan : RCR with its joint venture partner WBHO Infrastructure awarded contract with for the Balance of Plant (“BOP”) works. The scope of work includes engineering, procurement, construction (“EPC”) and commissioning of the BOP works, comprising site access roads, hardstands, fences, drainage, wind turbine foundations, substation, electrical reticulation and control system

* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)


approximate representation only

Robert Boyle

Name : Robert Boyle

Title : Project Manager

Phone : 1800 730 734

Email : [email protected]



* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)