Solar PV

100 MW

Yarranlea Solar Pty Ltd

$200mil

Planned

Yarranlea

QLD

-


Description:

Developed in four stages on up to 250Ha of sparsely vegetated farmland. Once completed the project will have generation capacity of up to 100 MW, producing enough energy to power up to 32,000 homes. Connected to the grid using existing Ergon Energy infrastructure adjacent to the development site to allow transmission of power into Toowoomba via the Middle Ridge Bulk Supply Substation.

Major Contractors/Suppliers:

-

Updates:

  • 2017, Apr : Stage 2 approved by Toowoomba Regional Council
  • 2016, Dec : Approved by the Toowoomba Regional Council

* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)


approximate representation only

Nick Canto

Name : Nick Canto

Title : Director

Phone : (07) 3870 8888

Email : [email protected]



* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)