Wind

212 MW

Nexif Energy

-

Under Construction

Lincoln Gap

SA

Battery


Description:

59 wind turbine project 15km west of Port Augusta. 126 MW first stage involves the construction and operation of 36 wind turbines, supported by off-take contracts with Snowy Hydro and ERM Power. The full project, a 59-wind turbine farm, will produce 212MW into the State’s electricity grid via the ElectraNet transmission network. The project also includes installation of a utility scale battery system of 10MW, with potential expansion capability to utilize battery technology advancements.

Major Contractors/Suppliers:

Engineer, supply and construct: Senvion Gmbh
Turbines: Senvion 3.6M140 EBC turbine
Power off-take: Snowy Hydro and ERM Power
Finance: CEFC and Investec
Concrete: Hallett Concrete

Updates:

  • 2017, Nov : Financial close reached
  • 2017, Apr : ERM Power signed two long-term Large Scale Generation Certificate (LGC) agreements
  • 2017, Feb : Entered into contracts with Senvion Gmbh of Germany to engineer, supply and construct wind farm

* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)


approximate representation only

Zeki Akbas

Name : Zeki Akbas

Title : CEO Australia

Phone : (03) 8660 6555

Email : [email protected]



* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)