Hybrid

3.5 MW

Advanced Energy Resources

$8 mil

Planned

Port Gregory

WA

Battery


Description:

The project will consist of up to 5 wind turbines with a rated capacity of approximately 2.5 MW, ~3500 panels with a generating capacity of up to 1 MW, a containerised battery storage unit and a 3.5km overhead power line to connect to Western Power‘s electricity network. The project will supply almost 70% of GMA Garnet’s sand mine electricity requirements. A 2.8 MW battery inverter will smooth electricity output. Port Gregory is located 120km from the nearest substation and at the fringe of the network.

Major Contractors/Suppliers:

PPA: GMA Garnet

Updates:

  • Dec, 2017 : Approved by the Shire of Northampton
  • 2017, Jun : Project announced

* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)


approximate representation only

Luca Castelli

Name : Luca Castelli

Title : Managing Director

Phone : (08) 9364 0400

Email : [email protected]