Description:

Developed in four stages on up to 250Ha of sparsely vegetated farmland. Over 200 jobs will be created during the construction phase of the plant which will have approximately 400,000 solar panels installed at the site. Connected to the grid using existing Ergon Energy infrastructure adjacent to the development site to allow transmission of power into Toowoomba via the Middle Ridge Bulk Supply Substation.

Major Contractors/Suppliers:

EPC: Risen Energy
Panels: Risen

Updates:

  • 2018, Jan : Risen Energy acquired 100% of the share of Yarranlea Solar Pty Ltd
  • 2017, Apr : Stage 2 approved by Toowoomba Regional Council
  • 2016, Dec : Approved by the Toowoomba Regional Council

* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)


approximate representation only

John Zhong

Name : John Zhong

Title : Project Development & Investment Director

Phone : (03) 9021 7788

Email : -



* Please advise us of any errors or out of date information. While every effort is made to ensure the accuracy and currency of the information provided, Altenergy accepts no liability or responsibility for the contents of www.altenergy.com.au (click here for full Terms & Conditions)